Sunroof Inspection Procedure

  1. Inspect the Drain Holes and Nipples.
    1. Inspect the Drain Holes and remove any blockages.

    2. Inspect the Forward Nipples.
    3. Inspect the Rear Nipples
  2. Replace blocked Nipples.
    1. Remove the blocked Nipple.
    2. Install new Nipple.
  3. Test the waterflow.
    1. Slowly add water to the Drain Holes.
    2. Inspect the Nipples to ensure that water is flowing freely.