Job Code: 754343D
Title: Main Landing Gear Torque Links - Disassembly procedures
Summary: Disassembly of Torque links on Main Landing Gear
Work Type: Disassembly Role: Maintenance disassembly
Expected Time: 42 min Work Cell: 6
Previous Job: 754340D Next Job: 75345D
PrerequisiteBOMResourcesInstructionsDocument

Safety Gear should be worn at all times.

Procedure is the same for left and right landing gear struts.

   
           Speed: