Installing SECT 4 ASSY

  1. Installing the PARTBODYS.
  2. Install the SIEMENS PUMP.
  3. Install the TANK HOLDING.
  4. Install the GENERATOR.
  5. Installing the PUMPS
    1. Install the PUMP 3.
    2. Install the PUMP 2.
    3. Install the PUMP 1.
  6. Install the REACTOR.
  7. Install the SHAFT MOTOR FOUNDATION.
  8. Install the TURBINE STEAM MOTOR.
  9. Install the HEAT EXCHANGER.
  10. Install the BAE SECT 4 PIPING.